A presentation slide with project details on a dark blue background, including location in Santa Paula, California, system size 286.72 kWh / 125 kW, battery type Risen Storage with CATL cells, inverter Delta 125 kW, and EMS Up Energy.

A CEC electrification grant funded project developed by Ventura Energy to provide power for high speed EV charging capabilities, providing energy arbitrage and supporting an area that has frequent power outages.

We helped Ventura navigate the project requirements by making sure the system was 9540 and UL1741 CRD compliant, providing flexible payment terms and managing commissioning.

Despite site delays with construction we stored the batteries for an extra 4 months for installation to be as easy as possible.